Skip to content
Design Studio · For heat pump OEMs

Designs that holdfrom survey to install.

Room by room heat loss, sizing and outputs with every assumption recorded. The design that wins the job is the one the installer fits, and the one performance is read against.

A module of HeatAssure™, from Aeterno. Also in the platform: HEM Access · Commissioning Verification

The bottleneck

Assumptions vanish between design and install.

When assumptions live in notes and spreadsheets, the handover breaks before installation starts. Design Studio keeps them on the home's record, visible and versioned, where the next person to touch the job can find them. It does not replace the tools your installers already design in: their tools stay and are fed from the same record. Design Studio is the design step for the work your own teams run in the platform.

What it does

A design step that survives delivery.

01

Room by room heat loss and sizing

The advanced heat loss editor with whole home context: size the system, compare scenarios, and produce outputs that meet the standards your process expects.

02

Assumptions stay visible

Inputs, constraints and trade offs are recorded with the design, so they survive review, handover and later verification.

03

Handover installers work from

Design decisions become delivery material. Room context and commissioning expectations travel with the job.

04

The verification baseline

What is designed here is the baseline commissioning verification reads against. The design survives as the promise the install is checked on.

Who works in it

One design, three teams served.

Design and technical teams

Room by room designs with clear assumptions, less variance between team members, and outputs that improve under review.

Commercial and pre-sales teams

Suitable homes move forward faster. Momentum holds between assessment and a deliverable design decision, with less survey waste.

Installer support teams

Designs, room context and commissioning expectations arrive whole, instead of partial notes rebuilt in the field.

The first piece of work

Start with your own jobs.

A first deployment proves design consistency, speed, and how much downstream rework disappears when assumptions stay explicit.

  1. 01

    Start with one contained design workflow or team.

  2. 02

    Use your existing survey inputs and current design outputs as the baseline.

  3. 03

    Get room by room outputs, visible assumptions and installer ready handover material.

  4. 04

    Extend into commissioning verification when the results earn it.

On the record
  • OEM assessment and quoting run on HeatAssure in production today.

The working behind these claims: how every calculation is validated on Technology, and the commissioning quality proof the design baseline feeds.

Questions

Asked before most deployments.

Next step

Start with the design bottleneck.

If conversion, survey efficiency or installer handover is the immediate problem, Design Studio is where deployments usually begin.